Del. no. Deliverable name WP no. Planned delivery date Actual delivery date Status Comments
2.1 EuCARD-2 Key Technology Areas 2 M12 12/05/2014 Achieved Report
3.1 Cooling related inventory 3 M12 05/05/2014 Achieved Report
3.2 Design study on a pulsed quadrupole system 3 M12 30/06/2014 Achieved Report confidential

Year 2

Del no. Deliverable name WP no. Planned delivery date Actual delivery date Status Comments
1.1 Key results of the five accelerator networks 1 M18 05/11/2014 Achieved Report
6.1 Low Emittance Ring Design interim report (INFN) 6 M18 14/11/2014 Achieved Report
6.2 Instabilities, Impedances and Collective Effects interim report 6 M18 30/10/2014 Achieved Report
6.3 Low Emittance Ring Technology Interim report (CERN) 6 M18 18/11/2014 Achieved Report
10.1 Conceptual study of HTS accelerator magnets 10 M18 05/11/2014 Achieved Report
12.1 Deposition test facilities implemented and verified at CERN and Grenoble INP 12 M18 16/10/2014 Achieved Report
12.2 Initial progress report of task 12.3 12 M18 31/10/2014 Achieved Report
12.3 Design of electronics for XFEL HOM diagnostics 12 M18 30/10/2014 Achieved Report
12.4 Scientific report on photocathode R&D 12 M18 30/10/2014 Achieved Report
13.1 Technical design report on ultra-fast longitudinal feedback for FLASH 13 M18 30/10/2014 Achieved Report
1.2 1st EuCARD-2 Periodic Report 1 M20 13/12/2014 Achieved Report
4.1 High beam power targets requirements 4 M24 30/04/2015 Achieved Report
7.1 Interim EuroNNAc2 report 7 M24 30/04/2015 Achieved Report
10.2 Prototype cable lengths and report 10 M24 30/04/2015 Achieved Report
13.2 Simulation of external injection into bubble 13 M24 29/04/2015 Achieved Report
13.3 Optimal realizable SPS configuration 13 M24 30/04/2015 Achieved Report

Year 3

Del. no. Deliverable name WP no. Planned delivery date Actual delivery date Status Comments
10.3 Parameters for choice of SC type 10 M28 27/08/2015 Achieved Report
3.3 Beam transfer channels comparison 3 M30 27/10/2015 Achieved Report
4.2 Low energy proton accelerator applications 4 M36 11/05/2016 Achieved Report
4.3 Intermediate energy proton and ion applications 4 M36 11/05/2016 Achieved Report
5.1 Preliminary strategy for future hadron & lepton colliders 5 M36 24/06/2016 Achieved Report
5.2 Preliminary strategy for future highperformance hadron rings 5 M36 24/06/2016 Achieved Report
5.3 Preliminary strategy for future high-power high-current SC linacs 5 M36 24/06/2016 Achieved Report
5.4 Preliminary strategy for future polarized beams 5 M36 24/06/2016 Achieved Report
11.1 Result on simulations of new materials and composites 11 M36 23/06/2016 Achieved Report
12.5 First resonator deposited and qualified at CERN 12 M36 21/12/2016 Achieved Report
12.6 Intermediate progress report of task 12.3 12 M36 19/05/2016 Achieved Report
12.7 Completed characterisation of HOMs in the 8-cavity XFEL 3HC module 12 M36 17/06/2016 Achieved Report
12.8 Optimised procedure for preparation of flat, clean and adherent Pb/Nb films 12 M36 02/09/2016 Achieved Report
13.4 Experimental characterization of electron beams 13 M36 19/05/2016 Achieved

Report

13.5 FLASH NRF cavity and FB system 13 M36   Delayed Delayed to M48. Justification

Year 4

Del no. Deliverable name WP no. Planned delivery date Actual delivery date Status Comments
1.3 2nd EuCARD-2 Periodic Report 1 M38 30/06/2016 Achieved Report
11.2 Report on comparative assessment of beam simulation codes 11 M40 30/09/2016 Achieved Report
3.4 Energy Storage 3 M42 25/11/2016 Achieved Report
3.5 Virtual power plants at accelerator facilities 3 M42 21/12/2016 Achieved Report
12.9 Pb/Nb plug photocathodes measurements and characterization 12 M42 21/12/2016 Achieved Report
2.2 Final work package report 2 M44 30/01/2017 Achieved Report
10.4 Magnet Cold test 10 M44   Delayed Delayed to M48. Justification
4.4 ADS conceptual design assessment 4 M45 17/03/2017 Achieved Report
3.6 Efficient RF systems and heat recovery 3 M46 05/04/2017 Achieved Report
4.5 AccApplic final report 4 M46      
5.5 Strategy for future extreme beam facilities 5 M46      
6.4 Low Emittance Ring Design final report 6 M46 17/03/2017 Achieved Report
6.5 Instabilities, Impedances and Collective Effects final report 6 M46 03/03/2017 Achieved Report
6.6 Low Emittance Ring Technology final report 6 M46      
7.2 Final EuroNNAc2 report - a European roadmap 7 M46      
11.3 Irradiation test results 11 M46 13/04/2017 Achieved Report
11.4 Results on characterisation of new materials and composites 11 M46 23/03/2017 Achieved Report
1.4 3rd EuCARD-2 Periodic Report 1 M48      
1.5 Final EuCARD-2 Project Report 1 M48      
1.6 Final plan for use and dissemination of foreground 1 M48      
1.7 EuCARD-2 project monograph 1 M48      
8.1 Transnational Access to ICTF@STFC 8 M48      
9.1 Transnational Access to HiRadMat@SPS 9 M48      
9.2 Transnational Access to MagNet@CERN 9 M48      
12.10 Cavity deposited and qualified at CEA 12 M48      
12.11 Final report of task 12.3 12 M48      
12.12 Report on characterisation of HOMs in XFEL coupled 3HC cryomodule 12 M48      
12.13 Results of DAC implementation in SRF guns 12 M48      
13.6 Optimum beam-plasma configuration 13 M48      