Year 1 | Year 2 | Year 3 | Year 4
Year 1
Del. no. | Deliverable name | WP no. | Planned delivery date | Actual delivery date | Status | Comments |
2.1 | EuCARD-2 Key Technology Areas | 2 | M12 | 12/05/2014 | Achieved | Report |
3.1 | Cooling related inventory | 3 | M12 | 05/05/2014 | Achieved | Report |
3.2 | Design study on a pulsed quadrupole system | 3 | M12 | 30/06/2014 | Achieved | Report confidential |
Year 2
Del no. | Deliverable name | WP no. | Planned delivery date | Actual delivery date | Status | Comments |
1.1 | Key results of the five accelerator networks | 1 | M18 | 05/11/2014 | Achieved | Report |
6.1 | Low Emittance Ring Design interim report (INFN) | 6 | M18 | 14/11/2014 | Achieved | Report |
6.2 | Instabilities, Impedances and Collective Effects interim report | 6 | M18 | 30/10/2014 | Achieved | Report |
6.3 | Low Emittance Ring Technology Interim report (CERN) | 6 | M18 | 18/11/2014 | Achieved | Report |
10.1 | Conceptual study of HTS accelerator magnets | 10 | M18 | 05/11/2014 | Achieved | Report |
12.1 | Deposition test facilities implemented and verified at CERN and Grenoble INP | 12 | M18 | 16/10/2014 | Achieved | Report |
12.2 | Initial progress report of task 12.3 | 12 | M18 | 31/10/2014 | Achieved | Report |
12.3 | Design of electronics for XFEL HOM diagnostics | 12 | M18 | 30/10/2014 | Achieved | Report |
12.4 | Scientific report on photocathode R&D | 12 | M18 | 30/10/2014 | Achieved | Report |
13.1 | Technical design report on ultra-fast longitudinal feedback for FLASH | 13 | M18 | 30/10/2014 | Achieved | Report |
1.2 | 1st EuCARD-2 Periodic Report | 1 | M20 | 13/12/2014 | Achieved | Report |
4.1 | High beam power targets requirements | 4 | M24 | 30/04/2015 | Achieved | Report |
7.1 | Interim EuroNNAc2 report | 7 | M24 | 30/04/2015 | Achieved | Report |
10.2 | Prototype cable lengths and report | 10 | M24 | 30/04/2015 | Achieved | Report |
13.2 | Simulation of external injection into bubble | 13 | M24 | 29/04/2015 | Achieved | Report |
13.3 | Optimal realizable SPS configuration | 13 | M24 | 30/04/2015 | Achieved | Report |
Year 3
Del. no. | Deliverable name | WP no. | Planned delivery date | Actual delivery date | Status | Comments |
10.3 | Parameters for choice of SC type | 10 | M28 | 27/08/2015 | Achieved | Report |
3.3 | Beam transfer channels comparison | 3 | M30 | 27/10/2015 | Achieved | Report |
4.2 | Low energy proton accelerator applications | 4 | M36 | 11/05/2016 | Achieved | Report |
4.3 | Intermediate energy proton and ion applications | 4 | M36 | 11/05/2016 | Achieved | Report |
5.1 | Preliminary strategy for future hadron & lepton colliders | 5 | M36 | 24/06/2016 | Achieved | Report |
5.2 | Preliminary strategy for future highperformance hadron rings | 5 | M36 | 24/06/2016 | Achieved | Report |
5.3 | Preliminary strategy for future high-power high-current SC linacs | 5 | M36 | 24/06/2016 | Achieved | Report |
5.4 | Preliminary strategy for future polarized beams | 5 | M36 | 24/06/2016 | Achieved | Report |
11.1 | Result on simulations of new materials and composites | 11 | M36 | 23/06/2016 | Achieved | Report |
12.5 | First resonator deposited and qualified at CERN | 12 | M36 | 21/12/2016 | Achieved | Report |
12.6 | Intermediate progress report of task 12.3 | 12 | M36 | 19/05/2016 | Achieved | Report |
12.7 | Completed characterisation of HOMs in the 8-cavity XFEL 3HC module | 12 | M36 | 17/06/2016 | Achieved | Report |
12.8 | Optimised procedure for preparation of flat, clean and adherent Pb/Nb films | 12 | M36 | 02/09/2016 | Achieved | Report |
13.4 | Experimental characterization of electron beams | 13 | M36 | 19/05/2016 | Achieved | |
13.5 | FLASH NRF cavity and FB system | 13 | M36 | 31/05/2017 | Achieved | Report |
Year 4
Del no. | Deliverable name | WP no. | Planned delivery date | Actual delivery date | Status | Comments |
1.3 | 2nd EuCARD-2 Periodic Report | 1 | M38 | 30/06/2016 | Achieved | Report |
11.2 | Report on comparative assessment of beam simulation codes | 11 | M40 | 30/09/2016 | Achieved | Report |
3.4 | Energy Storage | 3 | M42 | 25/11/2016 | Achieved | Report |
3.5 | Virtual power plants at accelerator facilities | 3 | M42 | 21/12/2016 | Achieved | Report |
12.9 | Pb/Nb plug photocathodes measurements and characterization | 12 | M42 | 21/12/2016 | Achieved | Report |
2.2 | Final work package report | 2 | M44 | 30/01/2017 | Achieved | Report |
10.4 | Magnet Cold test | 10 | M44 | 02/06/2017 | Achieved | Report - Delayed to M48. Justification |
4.4 | ADS conceptual design assessment | 4 | M45 | 17/03/2017 | Achieved | Report |
3.6 | Efficient RF systems and heat recovery | 3 | M46 | 05/04/2017 | Achieved | Report |
4.5 | AccApplic final report | 4 | M46 | 13/04/2017 | Achieved | Report |
5.5 | Strategy for future extreme beam facilities | 5 | M46 | 23/03/2017 | Achieved | Report |
6.4 | Low Emittance Ring Design final report | 6 | M46 | 17/03/2017 | Achieved | Report |
6.5 | Instabilities, Impedances and Collective Effects final report | 6 | M46 | 03/03/2017 | Achieved | Report |
6.6 | Low Emittance Ring Technology final report | 6 | M46 | 27/04/2017 | Achieved | Report |
7.2 | Final EuroNNAc2 report - a European roadmap | 7 | M46 | 15/06/2017 | Achieved | Report |
11.3 | Irradiation test results | 11 | M46 | 13/04/2017 | Achieved | Report |
11.4 | Results on characterisation of new materials and composites | 11 | M46 | 23/03/2017 | Achieved | Report |
1.4 | 3rd EuCARD-2 Periodic Report | 1 | M48 | 30/06/2017 | Achieved | Report |
1.5 | Final EuCARD-2 Project Report | 1 | M48 | 30/06/2017 | Achieved | Report |
1.6 | Final plan for use and dissemination of foreground | 1 | M48 | 30/06/2017 | Achieved | Report |
1.7 | EuCARD-2 project monograph | 1 | M48 | 30/06/2017 | Achieved | Report |
8.1 | Transnational Access to ICTF@STFC | 8 | M48 |
02/06/2017 |
Achieved | Report |
9.1 | Transnational Access to HiRadMat@SPS | 9 | M48 | 01/06/2017 | Achieved | Report |
9.2 | Transnational Access to MagNet@CERN | 9 | M48 | 01/06/2017 | Achieved | Report |
12.10 | Cavity deposited and qualified at CEA | 12 | M48 | 31/05/2017 | Achieved | Report |
12.11 | Final report of task 12.3 | 12 | M48 | 26/04/2017 | Achieved | Report |
12.12 | Report on characterisation of HOMs in XFEL coupled 3HC cryomodule | 12 | M48 | 30/05/2017 | Achieved | Report |
12.13 | Results of DAC implementation in SRF guns | 12 | M48 | 12/04/2017 | Achieved | Report |
13.6 | Optimum beam-plasma configuration | 13 | M48 | 17/05/2017 | Achieved | Report |