Deliverables

Year 1 | Year 2 | Year 3 | Year 4

Year 1

Del. no. Deliverable name WP no. Planned delivery date Actual delivery date Status Comments
2.1 EuCARD-2 Key Technology Areas 2 M12 12/05/2014 Achieved Report
3.1 Cooling related inventory 3 M12 05/05/2014 Achieved Report
3.2 Design study on a pulsed quadrupole system 3 M12 30/06/2014 Achieved Report confidential

Year 2

Del no. Deliverable name WP no. Planned delivery date Actual delivery date Status Comments
1.1 Key results of the five accelerator networks 1 M18 05/11/2014 Achieved Report
6.1 Low Emittance Ring Design interim report (INFN) 6 M18 14/11/2014 Achieved Report
6.2 Instabilities, Impedances and Collective Effects interim report 6 M18 30/10/2014 Achieved Report
6.3 Low Emittance Ring Technology Interim report (CERN) 6 M18 18/11/2014 Achieved Report
10.1 Conceptual study of HTS accelerator magnets 10 M18 05/11/2014 Achieved Report
12.1 Deposition test facilities implemented and verified at CERN and Grenoble INP 12 M18 16/10/2014 Achieved Report
12.2 Initial progress report of task 12.3 12 M18 31/10/2014 Achieved Report
12.3 Design of electronics for XFEL HOM diagnostics 12 M18 30/10/2014 Achieved Report
12.4 Scientific report on photocathode R&D 12 M18 30/10/2014 Achieved Report
13.1 Technical design report on ultra-fast longitudinal feedback for FLASH 13 M18 30/10/2014 Achieved Report
1.2 1st EuCARD-2 Periodic Report 1 M20 13/12/2014 Achieved Report
4.1 High beam power targets requirements 4 M24 30/04/2015 Achieved Report
7.1 Interim EuroNNAc2 report 7 M24 30/04/2015 Achieved Report
10.2 Prototype cable lengths and report 10 M24 30/04/2015 Achieved Report
13.2 Simulation of external injection into bubble 13 M24 29/04/2015 Achieved Report
13.3 Optimal realizable SPS configuration 13 M24 30/04/2015 Achieved Report

Year 3

Del. no. Deliverable name WP no. Planned delivery date Actual delivery date Status Comments
10.3 Parameters for choice of SC type 10 M28 27/08/2015 Achieved Report
3.3 Beam transfer channels comparison 3 M30 27/10/2015 Achieved Report
4.2 Low energy proton accelerator applications 4 M36 11/05/2016 Achieved Report
4.3 Intermediate energy proton and ion applications 4 M36 11/05/2016 Achieved Report
5.1 Preliminary strategy for future hadron & lepton colliders 5 M36 24/06/2016 Achieved Report
5.2 Preliminary strategy for future highperformance hadron rings 5 M36 24/06/2016 Achieved Report
5.3 Preliminary strategy for future high-power high-current SC linacs 5 M36 24/06/2016 Achieved Report
5.4 Preliminary strategy for future polarized beams 5 M36 24/06/2016 Achieved Report
11.1 Result on simulations of new materials and composites 11 M36 23/06/2016 Achieved Report
12.5 First resonator deposited and qualified at CERN 12 M36 21/12/2016 Achieved Report
12.6 Intermediate progress report of task 12.3 12 M36 19/05/2016 Achieved Report
12.7 Completed characterisation of HOMs in the 8-cavity XFEL 3HC module 12 M36 17/06/2016 Achieved Report
12.8 Optimised procedure for preparation of flat, clean and adherent Pb/Nb films 12 M36 02/09/2016 Achieved Report
13.4 Experimental characterization of electron beams 13 M36 19/05/2016 Achieved

Report

13.5 FLASH NRF cavity and FB system 13 M36 31/05/2017 Achieved Report

Year 4

Del no. Deliverable name WP no. Planned delivery date Actual delivery date Status Comments
1.3 2nd EuCARD-2 Periodic Report 1 M38 30/06/2016 Achieved Report
11.2 Report on comparative assessment of beam simulation codes 11 M40 30/09/2016 Achieved Report
3.4 Energy Storage 3 M42 25/11/2016 Achieved Report
3.5 Virtual power plants at accelerator facilities 3 M42 21/12/2016 Achieved Report
12.9 Pb/Nb plug photocathodes measurements and characterization 12 M42 21/12/2016 Achieved Report
2.2 Final work package report 2 M44 30/01/2017 Achieved Report
10.4 Magnet Cold test 10 M44 02/06/2017 Achieved Report - Delayed to M48. Justification
4.4 ADS conceptual design assessment 4 M45 17/03/2017 Achieved Report
3.6 Efficient RF systems and heat recovery 3 M46 05/04/2017 Achieved Report
4.5 AccApplic final report 4 M46 13/04/2017 Achieved Report
5.5 Strategy for future extreme beam facilities 5 M46 23/03/2017 Achieved Report
6.4 Low Emittance Ring Design final report 6 M46 17/03/2017 Achieved Report
6.5 Instabilities, Impedances and Collective Effects final report 6 M46 03/03/2017 Achieved Report
6.6 Low Emittance Ring Technology final report 6 M46 27/04/2017 Achieved Report
7.2 Final EuroNNAc2 report - a European roadmap 7 M46 15/06/2017 Achieved Report
11.3 Irradiation test results 11 M46 13/04/2017 Achieved Report
11.4 Results on characterisation of new materials and composites 11 M46 23/03/2017 Achieved Report
1.4 3rd EuCARD-2 Periodic Report 1 M48 30/06/2017 Achieved Report
1.5 Final EuCARD-2 Project Report 1 M48 30/06/2017 Achieved Report
1.6 Final plan for use and dissemination of foreground 1 M48 30/06/2017 Achieved Report
1.7 EuCARD-2 project monograph 1 M48 30/06/2017 Achieved Report
8.1 Transnational Access to ICTF@STFC 8 M48

02/06/2017

Achieved Report
9.1 Transnational Access to HiRadMat@SPS 9 M48 01/06/2017 Achieved Report
9.2 Transnational Access to MagNet@CERN 9 M48 01/06/2017 Achieved Report
12.10 Cavity deposited and qualified at CEA 12 M48 31/05/2017 Achieved Report
12.11 Final report of task 12.3 12 M48 26/04/2017 Achieved Report
12.12 Report on characterisation of HOMs in XFEL coupled 3HC cryomodule 12 M48 30/05/2017 Achieved Report
12.13 Results of DAC implementation in SRF guns 12 M48 12/04/2017 Achieved Report
13.6 Optimum beam-plasma configuration 13 M48 17/05/2017 Achieved Report