Milestones

Year 1 | Year 2 | Year 3 | Year 4

Year 1

Mil. no. Milestone name WP no. Planned delivery date Actual delivery date Status Comments
MS1 Consortium Agreement 1 M1 20/10/2013 Achieved Report
MS2 EuCARD-2 kick-off meeting 1 M1 18/09/2013 Achieved Report
MS3 EuCARD-2 project website launched 1 M1 20/04/2013 Achieved Report
MS4 EuCAN web pages available 1 M2 07/10/2013 Achieved Report
MS41 First workshop of Collective effects in Low Emittance Rings 6 M6 09/05/2014 Achieved Report
MS73 Commissioning of the SAPI for operation with metal photocathodes 12 M8 10/02/2014 Achieved Report
MS42 First workshop of Low Emittance Rings Technology 6 M9 29/07/2014 Achieved Report
MS5 Organization of the 1st Annual EuCARD-2 Collaboration Meeting 1 M12 17/07/2014 Achieved Report
MS21 Preliminary list of accelerator applications and candidate technologies 4 M12 22/01/2014 Achieved Report
MS22 Possible applications for neutron production targets 4 M12 16/05/2014 Achieved Report
MS23 First annual AccApplic workshop 4 M12 25/06/2014 Achieved Report
MS29 1st XCOLL topical workshop 5 M12 20/01/2014 Achieved Report
MS30 1st XRING topical workshop 5 M12 31/03/2014 Achieved Report
MS31 1st XLINAC topical workshop 5 M12 28/04/2014 Achieved Report
MS32 1st XPOL topical workshop 5 M12 04/04/2014 Achieved Report
MS43 Annual LOW-e-RING workshop, first year 6 M12 28/11/2013 Achieved Report
MS58 EuroNNAc2 2013 workshop 7 M12 04/11/2014 Achieved Report
MS62 Organized collaboration with DOE Program Bi-2212 10 M12 21/07/2014 Achieved Report
MS63 Cable concept design report 10 M12 09/05/2014 Achieved Report
MS69 Irradiate first sample 11 M12 12/08/2014 Achieved Report
MS74 Design concept RF front end 12 M12 11/06/2014 Achieved  Report
MS89 Demonstration and characterization of spatial and temporal synchronization of laser and electron beam 13 M12 17/04/2014 Achieved Report

Year 2

Mil. no. Milestone name WP no. Planned delivery date Actual delivery date Status Comments
MS24 Summary of existing applications of low energy accelerators and the technology used 4 M14 14/07/2014 Achieved Report
MS16 Heat recovery workshop 3 M15 23/06/2014 Achieved Report
MS6 Summary of year 1 communication and publication activities 1 M18 10/11/2014 Achieved Report included in 1st Periodic Report
MS13 EuCARD-2 meets Industry event #1 2 M18 20/05/2015 Achieved Report
MS17 Transport channels workshop 3 M18 05/12/2014 Achieved Report
MS25 Assessment of the state of the art of intermediate energy proton and ion accelerators 4 M18 26/09/2014 Achieved Report
MS26 Requirements for ADS 4 M18 29/10/2014 Achieved Report
MS44 First workshop of Low Emittance lattice design 6 M18 30/04/2015 Achieved Report
MS64 YBCO magnet design completion 10 M18 21/10/2014 Achieved Report
MS75 Investigation of quantum yield and energy spectrum of the electrons, emitted from the metal photocat 12 M18 17/10/2014 Achieved Report
MS90 Development and characterization of a new gas target system that includes a controllable, well-local 13 M18 07/10/2014 Achieved Report
MS91 Simulation of SPS beam self-modulation in plasma including seeding by laser and (optionally) by a sh 13 M18 07/10/2014 Achieved Report
MS18 Energy Storage workshop 3 M22 06/11/2015 Achieved Report
MS7 Organization of the 2nd Annual EuCARD-2 Collaboration Meeting 1 M24 30/04/2015 Achieved Report
MS8 EuCARD-2 mid-term Review 1 M24 21/05/2015 Achieved Report
MS19 Survey on candidates for VPP in accelerator labs 3 M24 16/12/2015 Achieved Report
MS27 Second annual AccApplic workshop 4 M24 30/04/2015 Achieved Report
MS33 2nd XCOLL topical workshop 5 M24 28/04/2015 Achieved Report
MS34 2nd XRING topical workshop 5 M24 07/01/2015 Achieved Report
MS35 2nd XLINAC topical workshop 5 M24 08/07/2015 Achieved Report
MS36 2nd XPOL topical workshop 5 M24 12/11/2015 Achieved Report
MS45 Annual LOW-e-RING workshop, second year 6 M24 28/10/2014 Achieved Report
MS59 EuroNNAc2 2014 workshop 7 M24 28/04/2015 Achieved Report
MS70 Present results on material damage from irradiation 11 M24 09/12/2016 Achieved Report
MS71 Show new material development status 11 M24 03/06/2015 Achieved Confidential
MS76 High power RF components fabricated and tested at low level 12 M24 30/04/2015 Achieved Report
MS77 Phase stabilisation experiment design 12 M24 30/04/2015 Achieved Report

Year 3

Mil. no. Milestone name WP no. Planned delivery date Actual delivery date Status Comments
MS65 Test Station Kick-off 10 M26 08/07/2015 Achieved Report
MS20 Efficient RF Systems workshop 3 M27 17/12/2014 Achieved Report
MS14 EuCARD-2 meets Industry event #2 2 M30 14/12/2015 Achieved Report
MS46 Second workshop of Collective effects in Low Emittance Rings 6 M30 20/05/2016 Achieved Report
MS78 Characterisation test facility implemented at HZB 12 M30 27/10/2015 Achieved Report
MS79 Crab cavity electromagnetic design 12 M30 29/02/2016 Achieved Report
MS80 Demonstrated operation of improved deposition system, Pb layers of 1 μm in thickness 12 M30 27/10/2015 Achieved Report
MS92 NRF operation established with closed beam based FB loop 13 M30 Covered by Del13.5 Achieved Report
MS93 Diagnostic system installed and performance determined 13 M30 27/10/2015 Achieved Report
MS66 First Cable length for magnet winding 10 M32 22/12/2015 Achieved Report
MS47 Second workshop of Low Emittance Rings Technology 6 M33 22/06/2017

Achieved

Report
MS9 Summary of year 2 communication and publication activities 1 M36 30/06/2015 Achieved Report included in 1st Periodic Report
MS10 Organization of the 3rd Annual EuCARD-2 Collaboration Meeting 1 M36 30/06/2016 Achieved Report
MS28 Third annual AccApplic workshop 4 M36 26/05/2016 Achieved Report
MS37 3rd XCOLL topical workshop 5 M36 11/03/2016 Achieved Report
MS38 3rd XRING topical workshop 5 M36 22/01/2016 Achieved Report
MS39 3rd XLINAC topical workshop 5 M36 22/01/2016 Achieved Report
MS40 3rd XPOL topical workshop 5 M36 20/06/2016 Achieved Report
MS48 Annual LOW-e-RING workshop, third year 6 M36 22/04/2016 Achieved Report
MS49 Second workshop of Low Emittance lattice design 6 M36 22/06/2017 Achieved Report
MS60 EuroNNAc2 2015 workshop 7 M36 21/04/2016 Achieved Report
MS67 Report on HE-LHC Main Dipole design 10 M36 30/06/2016 Achieved Report
MS68 Technical and economical comparison YBCO/Bi2212 magnets 10 M36 21/04/2016 Achieved Report
MS81 RF design CLIC_DDS_B FP and HOM couplers 12 M36 02/06/2017 Achieved Report
MS82 Completed coupled cavity simulations of 8-cavity module 12 M36 17/06/2016 Achieved Combined with D12.7
MS83 Manufacturing and commissioning of the photocathode transport system 12 M36 21/04/2016 Achieved Report
MS94 Simulation of modular plasma configuration with beam guiding between plasma modules 13 M36 21/04/2016 Achieved Report

Year 4

Mil. no. Milestone name WP no. Planned delivery date Actual delivery date Status Comments
MS84 Deposition test facility designed at CEA 12 M40 Covered by Del12.10 Achieved Report
MS15 EuCARD-2 meets Industry event #3 2 M42 21/12/2016 Achieved Report
MS85 Investigation of the brightness of different metal photocathodes in a S-band NCRF gun 12 M42 14/06/2017 Achieved Report
MS72 Present results on material damage from simulation and compare to experiments 11 M45 Combined with Del11.4 Achieved Report
MS86 RF design of fully interleaved structure 12 M45 04/04/2017 Achieved Report
MS11 Summary of year 4 communication and publication activities 1 M48 30/06/2017 Achieved Report included in the 3rd Periodic Report.
MS12 Organization of the final Annual EuCARD-2 Collaboration Meeting 1 M48 29/05/2017 Achieved Report
MS61 EuroNNAc2 2016 workshop 7 M48 15/06/2017 Achieved Report
MS87 Fundamental physics report 12 M48 02/06/2017 Achieved Report
MS88 Report summarising the results obtained in characterising the various new thin film technologies 12 M48 02/06/2017 Achieved Report

 

 